Finishing up the firewall reinforcement bracket and relocation of the power booster on the 69, New front rotors on the 93, dropping the 727 out of the dually to upgrade to Red Eagle 5 clutch pack, billet servo's, 4.4 ratio front band lever, Red Eagle HD front & rear bands and a new low stall speed converter. All this in between adding a new deck and enclosed room on the back of the house. This should take care of my summer
Oh ya, and I'm getting Axel my 8 month old Beagle started on cottontail too.
Mark D.
1968 W200 Sweptline
1969 D100 Utiline
1971 D100 SE Sweptline
1993 D250 Club Cab Sweptline
1986 W250 Cab & Chassis
1978 D300 Sweptline
E. Brookfield, Massachusetts